Costumer: | CTR |
Location: | Copenhagen |
Power: | 40 MW |
Connection Voltage: | 10 kV |
Scope:
- E-Boiler Design and Delivery
- Design Complete Installation Electrical/Mechanical incl. ROHR2 Pipe Calculations
- TÜV Approval
- HAZOP Study
- SIL Calculations
- Aux Equipment
- Siemens S7 Failsafe Control System
- Test & Commissioning
- Prequalification Testing with TSO According to Entso E-Gridcodes