Costumer:Norske Skog
Location:Bruck an der Mur
Power:20 MW
Connection Voltage:20 kV

Scope:

  • E-Boiler Design and Delivery
  • Design, Complete Installation Electrical/Boiler
  • TÜV Approval
  • HAZOP Study
  • SIL Calculations
  • Aux Equipment
  • Siemens S7 Failsafe Control System
  • Test & Commissioning
  • Prequalification Testing with TSO According to Entso E-Gridcodes